The MCBs should be clipped on to the Din bar and also the busbar right into a recent flowing terminal and restricted screwed to provide existing for the MCBs.Two 16/25mm tail cables, 1 neutral and the other Lively are connected to the principle double pole switch in the meter. The leading earth cable really should be screwed in the earth block, and